Barbara
Note the West Montrose Covered Bridge (Kissing Bridge) will be totally closed to all traffic (vehicles, bikes, foot) from mid-August 2025 through December 2026 (16 months). No parking at north end of the bridge will be available.
Note the West Montrose Covered Bridge (Kissing Bridge) will be totally closed to all traffic (vehicles, bikes, foot) from mid-August 2025 through December 2026 (16 months). No parking at north end of the bridge will be available.